Documents related to the Environmental Impact Statement (EIS) for F-15 Beddown and Infrastructure Upgrades at Andersen Air Force Base (AFB), Guam are available here for downloading or online browsing.
Final EIS |
---|
The Notice of Availability of the Draft EIS for F-15 Beddown and Infrastructure Upgrades at Andersen AFB, Guam was published in the Federal Register on April 25, 2025 and is available for review below.
Newspaper notices announcing the availability of the Final EIS were published in CNMI newspapers to coincide with the Notice of Availability in the Federal Register.
Existing authorizations supporting the Proposed Action:
The Draft EIS is available for review below. A version of the Draft EIS with line numbers is also included.
Draft EIS | Draft EIS (with line numbers) |
---|---|
Note: Due to the presence of line numbers, this version of the Draft EIS is not compatible with screen readers. |
During the public review period, the Draft EIS was also available for review at the following libraries: Nieves M. Flores Memorial Library, 254 Martyr Street, Hagåtña, GU 96910; and University of Guam Robert F. Kennedy Memorial Library, Government Documents, Tan Siu Lin Building, UOG Station, 303 University Drive, Mangilao, GU 96923.
A flyer outlining the Draft EIS public meetings, and review and commenting process is available for review.
The Notice of Availability of the Draft EIS for F-15 Beddown and Infrastructure Upgrades at Andersen AFB, Guam was published in the Federal Register on June 14, 2024.
Example of a newspaper notice announcing the public review period and public meetings published in local newspapers.
Public meeting presentation providing more detailed information about NEPA, the public review period, the Proposed Action, alternatives review, impacts analysis, and how to provide comments.
A brochure about the F-15 Beddown and Infrastructure Upgrades is available in English and CHamoru.
Informational Brochure (English)
Informational Brochure (CHamoru)
Meeting posters with additional information about the proposed F-15 Beddown and Infrastructure Upgrades.
A downloadable comment form for print and mailing of comments.
Materials that were developed as part of the additional public scoping period conducted for the EIS for F-15 Beddown and Infrastructure Upgrades at Andersen AFB, Guam. The second public scoping period ended on January 15, 2024.
Materials that were developed as part of the initial public scoping period conducted for the EIS for Infrastructure Upgrades at Andersen AFB, Guam prior to the revision to the scope of the Proposed Action. The initial public scoping period ended on May 30, 2021.